详情: 15876091220 黄·商务QQ:3274453293·http://www.zsfulaite.com
水包水多彩涂料|多彩漆批发价格|花岗岩涂料厂家|仿石花岗岩涂料工艺
广东中山福莱特涂料公司专业生产销售: |小黄15876091220| QQ:3274453293天然真石漆|水包水多彩漆|岩片漆|质感漆|水性氟碳漆|防水涂料|隔热涂料|弹性拉毛漆|水性金属漆
作业条件: Job requirements:
1、在基层处理之前,墙体需要一定时间的养护,一般新水泥墙面冬天的养护时间为28天,夏天的养护时间为14天。养护到基层的 pH 值小于 10,含水率小于 10% 后,再进行基面处理。
1, before the basic level processing, wall needs a certain time of maintenance, new cement metope commonly the curing time of 28 days in winter, summer the curing time of 14 days. Maintenance to the pH value is less than 10, moisture content is less than 10%, then the base surface processing.
2、基层检查验收: 抹灰质量的允许偏差(mm)及检验方法。
2, examination and acceptance of grassroots: allow the rendering quality deviation (mm) and the inspection method.
3、基层应清洁,表面无灰尘、无浮浆、无油迹、无锈斑、无霉点、无盐类析出物和无青苔等杂物。
3, the basic unit should be clean, no dust, no floating on the surface of slurry, WuYouJi, no rusty spot, no mildew, salt deposition and moss and other sundry.
4、门窗按设计要求安装完毕,并通过验收。
4, doors and Windows installed according to design requirements, and through the acceptance.
5、完成雨水管卡、设备洞口、管道的安装,并将洞口四周用水泥砂浆抹平,所有的墙面需晾干。
5, to complete the installation of the storm sewer card, the hole equipment, pipeline, and around the mouth of the cave with cement mortar, the metope of all need to be dry.
6、采用双排架子或吊篮施工,应符合国家安全规范要求。 7、在施工前,对不进行施工的部位进行遮挡保护。
6, double row of shelves or hanging basket construction, should comply with national safety regulations. 7, before construction, not for the part of the construction of barrier protection.